Hillsborough Leisure Centre, Commercial Boiler Replacement, Sheffield

Hillsborough Leisure Centre Pool Hillsborough Leisure Centre Entrance Hillsborough Leisure Centre Pool Boilers and Heaters
  • Main Contractor:
  • Sheffield International Venues Limited
  • Client:
  • Leisure Facilities
  • Type:
  • Specified
  • Procurement:
  • Tendered & Negotiated
  • Location:
  • Hillsbrough, Sheffield
  • Project Value:
  • £81,000.00

The Project

This commercial boiler replacement project was to replace 2 of the 4 existing boilers at the Hillsborough Leisure Centre.

Works involved the stripping out of 2 of the existing Hartley and Sugden boilers from the basement boiler house involving complex removal/lifting operations and replacing with 4 of the Vitocrossal 200w GC1B 311/285kw boilers.

The Solution

As appointed main contractor our responsibility was to ensure a smooth transition and no disruption to the facilities for the client and end user. This was achieved by isolating two of the existing boilers, alterations to the main gas pipes and heating flow and return water connections.

The works involved major flue alterations which meant conversion from normal gas fired boilers to condensing boilers/flues along with new condensate drains.

Project completed on time and on budget.

John Wright Electrical Downloadable Ebook

Free Brochure

If you would like more information about our company and the services we offer, Download our printable eBook, perfect for reading on the go, which is available 24/7.

Fill in a few details below to view our downloadable brochure.

Fields marked with an * are required.

This form is GDPR compliant and only collects your name & email so that we may respond to your request, via email or telephone, for information on our products and services that you have enquired about. Our website does not collect or store, in any format, the details you have submitted. Please see our Privacy Policy for further details.

Ebook Preview Page 1 Ebook Preview Page 2